Erecting a Vango awning, particularly an AirAwning®, involves methodical steps focused on secure attachment and proper shaping to ensure a stable and close fit with your caravan. Key aspects include using the provided rock pegs, ensuring a snug connection to the caravan, and correctly positioning the awning's structure.
Essential Steps for Pitching Your Vango Awning
Based on specific Vango guidance for their AirAwnings, the initial stages of erection focus on securing the awning to the ground and shaping its main structure. These steps are crucial for achieving optimal stability and usability.
- Utilize Supplied Rock Pegs: Begin by securing the base of your awning using the rock pegs supplied by Vango. These pegs are specifically designed to provide the necessary grip and stability for your awning's ground anchorage.
- Achieve a Close Fit: As you position the awning, ensure that a close fit is achieved between the awning and the caravan. This tight seal is vital for minimizing drafts, maximizing interior comfort, and enhancing the overall stability of the setup.
- Pull Front Away: Once the awning is initially connected or as part of its structural deployment, pull the front of the air awning away from the caravan. This action helps to properly extend the awning's inflatable frame and create its intended internal volume.
- Roughly Position Corners: Following the extension of the front, proceed to roughly position the corners of the awning. This preliminary step helps to define the overall footprint and square up the awning before final tensioning and adjustments are made.
Understanding the Pitching Process
While the core steps above are fundamental, the overall erection of a Vango AirAwning® typically follows a sequence that leverages its inflatable design for ease of setup.
Step | Description | Benefit |
---|---|---|
Initial Attachment | Slide the awning's kador strip into the caravan's awning rail. | Forms the primary secure connection between the awning and the caravan. |
Inflation (AirAwning) | Using the provided pump, inflate the AirBeams until the awning takes its full shape and is firm. | Replaces traditional poles, making setup quicker and lighter. |
Pegging Out | Use the supplied rock pegs to secure the base of the awning to the ground, as well as any relevant guylines. (As detailed in Vango's specific guidance) | Provides essential wind resistance and structural stability. |
Shaping & Positioning | Pull the front of the awning away from the caravan and roughly position the corners to define its footprint. (As detailed in Vango's specific guidance) | Ensures the awning is extended properly and its layout is correct before final adjustments. |
Final Tensioning | Adjust all straps, guylines, and pegging points to ensure even tension across the awning fabric, removing any slack. | Maximizes stability, prevents flapping in wind, and creates a taut, professional look. |
Practical Tips for a Successful Pitch
- Consult Your Manual: Always refer to the specific instruction manual for your Vango awning model, as details can vary.
- Level Ground: Whenever possible, pitch your awning on flat, level ground to ensure even tension and proper drainage.
- Check Valves: For AirBeam awnings, ensure all inflation and deflation valves are correctly closed before pumping and sealed after inflation.
- Even Tension: Distribute tension evenly across all pegging points and guylines to prevent undue stress on particular areas of the awning fabric.
By diligently following these steps, especially those emphasizing the use of rock pegs for a close fit and precise positioning, you can effectively erect your Vango awning, setting the stage for a comfortable and secure outdoor living space. For visual demonstrations, you can often find Vango AirAwning® pitching videos online, such as those on YouTube, which can offer further clarity.