How to Close a Borehole

Published in Borehole Closure 4 mins read

Closing a borehole, often referred to as well abandonment or decommissioning, is a critical process to prevent groundwater contamination, ensure public safety, and comply with environmental regulations. It involves systematically filling and sealing the well to isolate different geological formations and prevent the vertical migration of fluids.

Why Borehole Closure is Essential

Proper borehole closure is vital for several reasons:

  • Environmental Protection: Prevents contaminants from entering groundwater aquifers and safeguards water quality.
  • Public Safety: Eliminates physical hazards like open holes that could cause falls or accidents.
  • Resource Management: Prevents the intermingling of water from different aquifers, which can degrade water quality or deplete specific sources.
  • Regulatory Compliance: Adheres to local, state, and national environmental laws and guidelines for well decommissioning.

Key Steps to Closing a Borehole

The process of closing a borehole is methodical, ensuring complete and effective sealing. While specific steps may vary based on borehole type, depth, and local regulations, the fundamental approach remains consistent.

1. Initial Assessment and Preparation

Before any material is introduced, a thorough assessment is crucial:

  • Site Inspection: Evaluate the borehole's condition, surrounding geology, and potential hazards.
  • Well Cleaning: Remove any debris, obstructions, or pumping equipment from the borehole. This might involve flushing or mechanical cleaning to ensure the sealing material can bond effectively with the borehole walls.
  • Logging: If necessary, conduct downhole logging to understand the geological formations and water-bearing zones to be isolated.

2. Bottom Plugging

The closure process typically begins from the bottom of the borehole.

  • Placement of Initial Plug: A solid plug of appropriate sealing material (like cement grout or highly compacted bentonite chips) is placed at the very bottom of the borehole to create a stable base. This ensures that subsequent materials do not simply sink further into the ground.

3. Stabilizing Fill (Gravel or Sand)

  • Layering for Deep Boreholes: For deeper boreholes, a layer of gravel or sand is added above the bottom plug. This step is crucial as it helps stabilize the hole and provides a robust base for the subsequent sealing material. The granular material prevents the sealing material from migrating downwards prematurely and ensures an even distribution.

4. Sealing Material Application

This is the most critical phase, involving the controlled placement of specialized sealing materials.

  • Continuous Filling: The borehole is filled with an appropriate sealing material from the bottom upwards. The choice of material depends on factors like local geology, water chemistry, and regulatory requirements.

    • Bentonite Clay: Often used for its excellent swelling properties when hydrated, creating a low-permeability seal. It comes in various forms, including pellets, chips, or grout.
    • Cement Grout: Provides a strong, durable, and impermeable seal. Different types of cement (e.g., Portland cement) can be mixed with additives to control setting time and strength.
    • Combination Materials: Sometimes, a combination of materials is used, such as alternating layers of bentonite and cement grout, or bentonite plugs within cement columns.
  • Placement Methods: Sealing materials are typically placed using methods that ensure continuous and uniform filling, preventing bridging or voids. Common methods include:

    • Tremie Pipe: Lowering a pipe to the bottom and pumping the grout up, displacing any water and preventing segregation of materials.
    • Gravity Feed: For shallower boreholes or specific materials, gravity feeding may be used, ensuring the material flows consistently.

5. Surface Completion

The final steps focus on securing the surface.

  • Cut-off Below Grade: The top of the casing is often cut off a few feet below ground level.
  • Surface Cap: A final plug of concrete or other durable material is placed at the surface to prevent surface water infiltration and provide a clear marker.
  • Site Restoration: The area is backfilled with native soil, compacted, and revegetated to blend with the surrounding landscape.

Common Sealing Materials

Understanding the properties of common sealing materials is vital for effective borehole closure:

Material Type Key Characteristics Ideal Use Cases
Bentonite Clay Swells significantly when wet; low permeability. Shallow wells, environmental monitoring wells, areas with fluctuating water tables.
Cement Grout High strength, durable, rigid; sets quickly. Deep wells, structural integrity, high-pressure environments.
Sand/Gravel Provides stable base, structural support, drainage. As backfill above bottom plugs, stabilizing deep boreholes.

Regulatory and Professional Considerations

It's crucial to consult with local and national regulatory bodies before initiating borehole closure. Guidelines often dictate:

  • Required materials and quantities.
  • Specific placement techniques.
  • Permitting and reporting requirements.
  • Qualifications for contractors performing the work.

Engaging experienced professionals ensures that the closure process is executed safely, effectively, and in full compliance with all relevant standards, protecting both the environment and public health.