How to Lay Bricks for Construction

Published in Bricklaying Techniques 5 mins read

Laying bricks involves a precise process of preparation, mortar application, and careful placement to construct a durable and visually appealing structure. Achieving a strong and stable brick wall requires attention to detail at every step.

Essential Preparations Before Laying Bricks

Before you begin laying bricks, thorough preparation is crucial. This includes planning, gathering the right tools, and preparing your materials.

Planning and Design

A well-thought-out plan ensures efficiency and accuracy.

  • Blueprint and Measurements: Determine the dimensions of your wall, including height, length, and thickness.
  • Material Calculation: Calculate the number of bricks and the quantity of mortar mix needed. It's wise to order a little extra for cuts and breakage.

Tools and Materials

Having the correct tools readily available streamlines the process.

Item Purpose
Bricks The primary building material
Mortar Mix Binds bricks together
Trowel Spreading mortar, tapping bricks
Level Ensuring straight and level courses
Plumb Bob Checking vertical alignment (plumb)
String Line Guiding straight lines for courses
Measuring Tape Accurate measurements
Brick Jointer Shaping mortar joints for finish and seal
Hammer/Chisel Cutting bricks (if needed)
Wheelbarrow/Mixer Mixing mortar
Safety Gear Gloves, safety glasses, knee pads

Step-by-Step Guide to Laying Bricks

Once your preparations are complete, you can begin the process of laying the bricks.

1. Preparing the Foundation

Ensure your foundation is solid, level, and fully cured. After the cement has cured, it provides a stable base for your brickwork. A strong foundation prevents settling and cracking in the future.

2. Mixing the Mortar

Properly mixed mortar is essential for strong bonds.

  • Ratio: A common mix ratio is 1 part cement, 0.5-1 part lime, and 3-4 parts sand. The lime improves workability and flexibility.
  • Consistency: Add water gradually to achieve a consistent, workable consistency similar to thick peanut butter or frosting. It should be stiff enough to hold its shape but soft enough to spread easily. For more details on mixing, you can consult reputable construction guides.

3. Laying the First Course (The Bed Course)

The first course is the most critical as it sets the alignment for the entire wall.

  • Spread Mortar: Carefully spread a 1-inch thick layer of mortar. This "bed joint" should be wide enough to fit a brick comfortably.
  • Place First Brick: Gently tap a brick into the mortar with the handle of your trowel until it is perfectly level. Use a spirit level to check both length-wise and width-wise.
  • Check Alignment: Ensure this first brick is precisely positioned as it dictates the line for subsequent bricks.

4. Laying Subsequent Courses

Once the first brick is set, you can proceed with the rest of the course and subsequent layers.

  • Apply Mortar to Ends: Add approximately 3/8 inch of mortar to one end of another brick (this creates the "head joint").
  • Attach Bricks: Firmly attach this brick to the one you already laid, ensuring a consistent 3/8-inch joint between them. Tap it down gently with your trowel handle until it is level with the previous brick and the bed joint is consistent.
  • Maintain Bonding Pattern: For structural integrity and aesthetic appeal, bricks are laid in patterns where vertical joints (head joints) are offset in successive courses. The most common is a "running bond," where each brick overlaps the one below it by half its length.
  • Use String Line: As you lay each course, run a string line from end to end at the desired height. This acts as a guide to keep your courses straight and level.
  • Repeat: Repeat the process of applying mortar, placing bricks, tapping, and checking level until the entire course is complete. Continue this process for each subsequent course until the wall is complete.

5. Checking for Plumb and Level

Regular checks are vital throughout the bricklaying process.

  • Level: Use your spirit level to check the horizontal level of each course after laying a few bricks.
  • Plumb: Use a plumb bob or a long level to ensure the wall is perfectly vertical (plumb) as it rises. Adjust bricks immediately while the mortar is still workable.

6. Jointing the Mortar

After the mortar has begun to set (when it's firm enough to hold a thumbprint but still workable), you can shape the joints.

  • Tooling: Use a brick jointer to compress and shape the mortar joints. A concave or V-shaped joint is popular as it sheds water effectively and creates a clean, finished look. This process is known as "tooling" or "striking" the joints.

7. Cleaning Excess Mortar

Promptly remove any excess mortar from the face of the bricks.

  • Brush: Use a stiff brush to gently remove loose mortar crumbs after jointing. Avoid smearing wet mortar, as it can stain the bricks.

8. Curing the Mortar

Proper curing allows the mortar to achieve its maximum strength.

  • Damp Curing: For several days after laying, keep the newly laid brickwork damp. This can be done by lightly misting it with water or covering it with plastic sheeting, especially in hot, dry, or windy conditions. Slow curing prevents the mortar from drying out too quickly and becoming brittle.

Important Tips for Successful Bricklaying

  • Consistency is Key: Strive for uniform mortar thickness, consistent jointing, and precise brick alignment for a professional finish.
  • Work in Sections: Don't try to lay too much brickwork at once, especially if you are new to the task. Work in manageable sections.
  • Safety First: Always wear appropriate safety gear, including gloves and eye protection, to protect against splashes and sharp edges.