How is Glass Installed on Buildings?

Published in Building Glass Installation 3 mins read

Glass installation on buildings primarily involves skilled glaziers who use distinct methods depending on the size of the pane, utilizing materials like putty, clips, bolts, and molding to ensure secure placement within frames.

Installing glass into building structures requires precision and adherence to specific techniques to guarantee durability, safety, and aesthetic appeal. The process varies significantly between standard-sized panes and much larger, often heavier, glass panels.

Key Installation Methods for Building Glass

The installation approach is largely determined by the dimensions and weight of the glass pane being fitted.

1. Installing Standard-Sized Panes

For typical window panes or smaller sections of glass, the method relies on a foundational layer for sealing and stability, followed by mechanical fasteners.

  • Foundation with Putty: Glaziers put the glass on a bed of putty to hold the glass in the frame. This putty, often a traditional linseed oil-based compound or a modern sealant, serves multiple purposes:
    • Cushioning: It provides a flexible bed that absorbs minor movements and prevents direct glass-to-frame contact, reducing stress.
    • Sealing: It creates an airtight and watertight seal, preventing drafts and moisture ingress.
    • Adhesion: It helps to temporarily hold the glass in place before mechanical fasteners are applied.
  • Securing the Glass: After the glass is set on the putty, they secure the glass with clips or bolts.
    • Clips: Small, spring-loaded metal pieces that fit into grooves in the frame and press against the glass edge.
    • Bolts: Used in conjunction with pressure plates or retaining strips, bolts pull components together to clamp the glass firmly.

2. Installing Large Panes of Glass

The process for installing large panes of glass, such as those found in modern curtain walls, large storefronts, or panoramic windows, is somewhat different due to their substantial size and weight, which necessitate more robust structural support.

  • Molding as Primary Support: Instead of a putty bed and simple clips, Glaziers screw molding into place and place the glass up against it.
    • Molding: These are typically robust metal or sometimes composite frames that are structurally integrated into the building's facade. They provide the primary support and frame for the massive glass panels.
    • Placement: The large glass panels are carefully lifted and positioned against these pre-installed moldings, often using specialized lifting equipment like cranes or suction cup lifters.
  • Securing within Molding: Once the glass is accurately positioned against the molding, additional retaining elements (such as cap moldings, pressure plates, or structural sealants) are applied and fastened to secure the glass firmly within the system. This creates a durable and weather-tight enclosure.

Summary of Glass Installation Methods

The following table summarizes the primary methods based on pane size:

Pane Size Key Method Components Primary Function
Standard/Smaller Bed of putty, secured with clips or bolts Sealing, cushioning, and mechanical fastening
Large Panes Molding screwed into place, glass placed against it Structural support, framing, and robust enclosure

Understanding these distinct approaches highlights the specialized skills of glaziers in ensuring safe and effective glass integration into diverse building designs.