zaro

What are the problems with standard costing?

Published in Cost Accounting Problems 5 mins read

Standard costing, while a valuable tool for cost control and performance measurement, comes with several significant drawbacks that can hinder its effectiveness and impact organizational dynamics.

What are the Problems with Standard Costing?

Standard costing, despite its benefits in setting benchmarks and identifying cost deviations, faces challenges concerning its accuracy, relevance, behavioral impact, and implementation.

Standard costing involves setting predetermined costs for production, which are then compared to actual costs to identify variances. While this system can highlight inefficiencies, its rigid nature and focus on historical data lead to several problems:


Key Disadvantages of Standard Costing

Standard costing presents various issues across accuracy, behavioral aspects, and practical application.

1. Issues with Accuracy and Relevance

  • Outdated Standards: In dynamic business environments, standard costs can quickly become obsolete due to changes in technology, material prices, labor rates, or production methods. If not frequently updated, these standards provide misleading performance indicators.
  • Lack of Flexibility: Standard costing assumes a stable production environment. It struggles to adapt to businesses with diverse product lines, custom orders, or fluctuating production volumes, making the established standards less relevant.
  • Focus on Cost Minimization: An overemphasis on meeting cost standards can inadvertently lead to a neglect of other crucial aspects like product quality, customer satisfaction, innovation, or employee well-being. This can be detrimental to long-term business health.

2. Challenges in Variance Analysis

  • Controversial Materiality Limits for Variances: Deciding what constitutes a "material" variance (one significant enough to warrant investigation) can be subjective and controversial. Different managers might have varying thresholds, leading to inconsistencies in reporting and follow-up actions.
  • Nonreporting of Certain Variances: Management might choose not to investigate or report all variances, especially if they are deemed "immaterial" or if unfavorable variances are offset by favorable ones. This can obscure underlying operational issues or missed opportunities for improvement.
  • Difficulty in Root Cause Identification: While variances highlight that a deviation occurred, they often don't explain why. Identifying the root cause (e.g., poor purchasing, inefficient labor, faulty machinery) requires further, often time-consuming, investigation beyond the standard costing report itself.
  • Historical Focus: Variance analysis is inherently backward-looking. It reports on what has already happened, rather than providing predictive insights or real-time control, which is crucial in fast-paced operational environments.

3. Behavioral and Motivational Issues

  • Low Morale for Some Workers: The pressure to meet predetermined standards can create stress and resentment among employees. If standards are perceived as unattainable, unfair, or if variances are used punitively, it can lead to demotivation, reduced job satisfaction, and even gaming the system (e.g., cutting corners).
  • Blame Culture: Standard costing can foster a "blame game" where departments or individuals are held solely responsible for unfavorable variances, even if the underlying causes are systemic or outside their control. This erodes teamwork and interdepartmental cooperation.
  • Discouragement of Continuous Improvement: If employees consistently meet standards, there might be little incentive to innovate or find more efficient ways of working. Similarly, if standards are too tight, it can discourage experimentation.
  • Myopic Focus: Employees might focus only on the metrics being measured by standard costing, neglecting broader organizational goals or opportunities for process improvement not directly tied to cost variances.

4. Implementation and Maintenance Challenges

  • Cost and Time to Set Standards: Establishing accurate and reliable standard costs requires significant time, effort, and resources for detailed analysis of production processes, material inputs, and labor requirements.
  • Frequent Updates Required: To remain relevant, standards need to be reviewed and updated regularly, which adds to the administrative burden and cost. Failing to update them renders the system less effective.
  • Complexity in Diverse Operations: Implementing and maintaining standard costing can be overly complex and burdensome for organizations with a wide variety of products, processes, or custom manufacturing.

Summary of Problems with Standard Costing

Problem Category Specific Issues
Accuracy & Relevance Outdated standards, lack of flexibility, overemphasis on cost minimization
Variance Analysis Controversial materiality limits, nonreporting of certain variances, difficulty in root cause identification, historical focus
Behavioral & Motivational Low morale, blame culture, discouragement of continuous improvement, myopic focus
Implementation & Maintenance Cost/time to set, frequent updates required, complexity in diverse operations

Solutions and Mitigation Strategies

To address these problems, businesses can consider several approaches:

  • Dynamic Standards: Regularly review and update standards to reflect current market conditions and operational changes.
  • Flexible Budgeting: Incorporate flexible budgets that adjust for varying activity levels, providing a more relevant benchmark than fixed standards. Learn more about flexible budgeting.
  • Beyond Cost Focus: Integrate standard costing with a broader performance measurement system like the Balanced Scorecard to include quality, innovation, and customer satisfaction metrics.
  • Process-Oriented Investigation: When variances occur, focus on understanding the underlying process issues rather than just assigning blame.
  • Employee Involvement: Involve employees in the standard-setting process to foster a sense of ownership and improve morale.
  • Activity-Based Costing (ABC): For complex operations, consider supplementing or replacing standard costing with Activity-Based Costing to gain a more accurate understanding of costs associated with specific activities.

By acknowledging these limitations and adopting more adaptive strategies, organizations can leverage the benefits of cost control while mitigating the common pitfalls associated with traditional standard costing.