For Shift 1, the actual shift timing is from 9:00 AM to 10:30 AM.
SSC MTS Shift 1 Timings Overview
Understanding the complete schedule for Shift 1 is crucial for candidates. This includes both the reporting time and the actual duration of the shift.
Key Timings for Shift 1
Shift 1 is structured with specific windows for reporting and the main shift duration. Candidates are expected to report well in advance of the shift to complete necessary formalities.
- Reporting Time: This is the window during which candidates must arrive at the venue. For Shift 1, the reporting time is between 7:45 AM and 8:30 AM. It is essential to adhere to this timeframe to ensure smooth entry and verification processes.
- Shift Timing: This refers to the actual duration of the examination or work shift. For Shift 1, the shift officially runs from 9:00 AM to 10:30 AM.
Here is a breakdown of the Shift 1 schedule:
Shift | Reporting Time | Shift Timing |
---|---|---|
Shift 1 | 7:45 AM – 8:30 AM | 9:00 AM – 10:30 AM |
Adhering to these timings ensures a smooth and organized experience for all participants.