How long did it take to build the current church at the San Gabriel Mission?

Published in Mission Construction 2 mins read

The construction of the current church at the San Gabriel Mission took approximately 17 to 18 years to complete.

Understanding the Construction Timeline

While the Mission San Gabriel Arcángel was founded in 1771, the construction of its prominent stone church, which stands today, began significantly later. Historical records indicate a specific timeframe for the erection of this key structure within the mission complex.

Key Dates in Church Construction:

  • Beginning of Construction: The building of the current church at Mission San Gabriel most likely commenced in either 1794 or 1795. This marked the start of a multi-year endeavor to create the durable stone edifice.
  • Completion of Main Construction: The primary construction phase for Mission San Gabriel's Church extended through 1812. This suggests that while work may have continued on details or ancillary structures, the main building was largely complete by this year.

This timeline indicates a substantial undertaking, reflecting the architectural ambitions and the labor involved in creating such a significant structure during that era.

Calculation of Construction Duration

To determine the approximate duration, we consider the probable start years and the completion year:

Event Year (Approximate Start) Year (Completion) Duration (Years)
Current Church 1794 1812 18
Current Church 1795 1812 17

Therefore, based on the historical information, the construction period for the current church structure ranged from 17 to 18 years. This lengthy period highlights the challenges of building with limited resources and technology in the late 18th and early 19th centuries.