To mix resin gravel effectively, you follow a specific sequence of adding aggregates and pre-mixed resin into a specialized mixer, typically a forced action mixer. This process ensures the aggregates are thoroughly coated with the resin for a strong, durable surface.

Understanding Resin Gravel Mixing Fundamentals

Mixing resin gravel, often used in resin-bound or resin-bonded surfacing, is a precise operation designed to fully encapsulate each aggregate particle with resin. This crucial step directly impacts the strength, permeability, and longevity of the final surface. The choice of equipment, particularly a forced action mixer, is vital as it provides the intensive mixing action needed to achieve proper coating.

Step-by-Step Process for Mixing Resin Gravel

The mixing process involves adding different aggregate sizes and the pre-mixed resin in a specific order to ensure optimal distribution and adhesion. This procedure is performed using a forced action mixer.

Here are the exact steps for mixing resin aggregates:

  1. Initial Aggregate Placement: Begin by loading the first 25kg bag of 2-5mm aggregates into the forced action mixer. Simultaneously, add the bag of 1-3mm aggregates to this initial batch.
  2. Resin Introduction: Immediately after the initial aggregates are in the mixer, add the pre-mixed resin. This ensures the resin is introduced to a foundational layer of aggregates.
  3. Final Aggregate Addition: Complete the aggregate loading by adding the remaining two bags of 2-5mm aggregates into the mixer.

This structured approach, as outlined by expert guidelines, is essential for achieving a uniform mix where every aggregate particle is evenly coated with the resin, forming a robust and permeable matrix.

Source: Resin Bonded Aggregates Knowledge Centre

Key Components and Sequence Summary

For clarity, the following table summarizes the components and their respective addition sequence during the resin gravel mixing process:

Step Component Quantity/Description Mixer Stage
1 2-5mm Aggregates First 25kg bag Initial Loading
1 1-3mm Aggregates One bag Initial Loading
2 Pre-mixed Resin (Pre-prepared quantity) After Initial Aggregates
3 2-5mm Aggregates Two additional bags Final Aggregate Addition

Essential Equipment for Mixing

The most critical piece of equipment for mixing resin gravel is a forced action mixer. Unlike traditional drum mixers, a forced action mixer has paddles or arms that actively push and fold the materials, ensuring a thorough and consistent blend of the resin with the aggregates. This is imperative for achieving the necessary bond and overall quality of the resin-bound system.