What issues or problems has Rocket Lab had?

Published in Rocket Lab Operations 4 mins read

Rocket Lab, a leading private aerospace manufacturer and small satellite launch service provider, has experienced several operational challenges and setbacks since its inception. These issues primarily include launch failures and ground support equipment problems, which are common in the complex and high-stakes environment of spaceflight.

Overview of Rocket Lab's Operational Issues

Rocket Lab has encountered a few notable incidents that have resulted in launch failures or aborts. These incidents highlight the inherent risks of rocket development and launch operations, prompting investigations and improvements to ensure future mission success.

Key Incidents and Problems

The company's issues have ranged from on-the-ground technical glitches to in-flight anomalies. Here's a summary of the most significant problems:

Date Mission Name / Context Rocket Type Issue Cause/Impact
Recent Abort Scheduled Launch from New Zealand Electron Aborted just prior to lift-off Issues with on-ground support equipment.
July 4, 2020 "It's Business Time" Electron Second stage engine shut down prematurely Faulty electrical connection in the second stage.
May 15, 2021 "Running Out Of Fingers" Electron Second stage engine anomaly during flight Engine igniter system issue.

1. Recent Launch Abort Due to Ground Support Equipment

A recent scheduled launch of Rocket Lab's Electron rocket from a facility in New Zealand was aborted just moments before lift-off. The cause of this abort was identified as issues with the on-ground support equipment. While such aborts are a common part of launch operations, designed to ensure safety and mission success by detecting anomalies before flight, they represent a procedural hiccup that delays missions and requires resolution of specific technical issues on the ground.

2. "It's Business Time" Launch Failure (2020)

On July 4, 2020, Rocket Lab experienced a critical failure during its "It's Business Time" mission, which was carrying satellites for multiple customers. Approximately four minutes into the flight, the Electron rocket's second stage engine shut down prematurely. This anomaly prevented the rocket from reaching orbit, resulting in the loss of the mission's payload.

  • Investigation Findings: Subsequent investigations revealed that the failure was caused by a faulty electrical connection within the rocket's second stage. This single point of failure led to a loss of telemetry and control, culminating in the engine shutdown.
  • Response: Rocket Lab implemented corrective actions, including enhanced testing procedures and modifications to the electrical systems, to prevent a recurrence.

3. "Running Out Of Fingers" Launch Failure (2021)

Less than a year later, on May 15, 2021, another Electron mission named "Running Out Of Fingers" encountered an issue during its second stage burn. After a successful first stage separation and second stage ignition, an engine anomaly occurred, leading to the loss of the mission. This incident occurred shortly after Rocket Lab had attempted to recover the first stage of the rocket, though the failure was unrelated to the recovery attempt itself.

  • Investigation Findings: The investigation determined that the issue was related to the rocket's engine igniter system, which led to the engine performing below nominal parameters.
  • Response: Rocket Lab introduced further design changes and improved quality control measures to address the root cause of this failure, emphasizing the continuous learning process inherent in spaceflight operations.

Mitigating Future Issues

Rocket Lab, like all aerospace companies, faces the challenge of operating highly complex systems where even minor anomalies can have significant consequences. Each incident provides valuable data for engineers to analyze, understand, and implement improvements. The company's response to these issues has typically involved:

  • Thorough Investigations: Detailed root cause analyses are conducted for every anomaly.
  • Corrective Actions: Implementing design changes, manufacturing process improvements, and enhanced testing protocols.
  • Increased Redundancy: Where feasible, adding backup systems to critical components.
  • Operational Scrutiny: Reviewing and refining launch procedures and ground support operations.

These ongoing efforts are crucial for Rocket Lab to maintain its reliability and continue to grow its market share in the competitive small satellite launch industry.